The factory and the buses, on camera. Short clips, no fluff — more added as we film them.
The factory
The rain booth running at the Wakarusa factory — every bus goes through it before delivery.The Impact Guard roof taking full swings on the factory floor.The TRUMPF TruLaser cutting bus structure — steel goes from sheet to bracket without leaving the building.
The buses
MAVRYK wheelchair-lift unit walkaround.MAVRYK rear wheelchair lift running a full deploy-and-stow cycle.Inside the MAVRYK wheelchair unit — driver area to rear lift.MAVRYK airport shuttle build — exterior and the luggage-friendly cabin.STRATOS walkaround — exterior, entry, cockpit, cabin, and rear restroom.
Refurbishment
A completed factory refurbishment — walkaround and finished interior.