Built at Investment Grade

Video library

The factory and the buses, on camera. Short clips, no fluff — more added as we film them.

The factory

The rain booth running at the Wakarusa factory — every bus goes through it before delivery.
The Impact Guard roof taking full swings on the factory floor.
The TRUMPF TruLaser cutting bus structure — steel goes from sheet to bracket without leaving the building.

The buses

MAVRYK wheelchair-lift unit walkaround.
MAVRYK rear wheelchair lift running a full deploy-and-stow cycle.
Inside the MAVRYK wheelchair unit — driver area to rear lift.
MAVRYK airport shuttle build — exterior and the luggage-friendly cabin.
STRATOS walkaround — exterior, entry, cockpit, cabin, and rear restroom.

Refurbishment

A completed factory refurbishment — walkaround and finished interior.

See the refurbishment program